Annex B  JTC 1 Standards Development Stages

Annex B

NOTES:
1)  Prior to the WD stage, new work is introduced into the programme of work via either a New Work Item Proposal (NP) for JTC 1 letter ballot (see 6.2.1) or a programme subdivision document for JTC 1 endorsement (see 6.2.2). In the case of NPs which are developed by an SC, the approval ballot will be conducted at the subcommittee level (see 9.3)

2)  NPs, CDs, FCDs, PDAMs, FPDAMs, PDTRs, PDISPs, FPDISPs and DCORs are balloted at the subcommittee level.

3)  NPs and DTRs are balloted at the JTC 1 level.

4) DIS, FDIS, FDAMs and FDISPs are balloted at the ISO/IEC National Body level and the JTC 1 level using the combined voting procedure.

5) Subsequent to the publication of an IS, AMD or ISP, Technical Corrigenda may be published to correct technical defects which adversely affect implementation.

6) The text of each abbreviation is given in full on vi.



Foreword   Table of Contents   List of Abbreviations   Index
Chapter: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Annex: A B C D E F G H HA HB HD HE  HF HG I J K  L  LA LB M MA  N O