Abstention 3.1.1 3.1.2 9.6 9.7 9.8 7.7.6 9.2
   From specific work item  9.6
Acting Chairman 5.4
Ad hoc group 2.6.2.5 7.10.4
Ad hoc meeting 3.4.3.1 7.8.2 7.11.1
Administration 4 
   JTC 1 4.2
   Non-permanent entity   4.5 
   SC 4.3
   WG 4.4
Advisory group 2.5.4
Agenda 7.2.1 7.5
   Distribution 2.5.4  7.8.1
   Preparation 7.6
Amendment 
   Cover page G21 
   Documents 8.1.4
   Listing status 15.5
   Numbering 12.5.1
   Periodic review 15.3
   Previous editions 15.1.5
   Procedures 15.4.3
   Purpose 15.5
   TR 16.1
API J1.1 
Appeals 11 18.4
Applicant (for registration) 2.7.2.4 E1 E2.3 
Application environment profile 10.5
Application portability 10.5   J1.1
Approval stage 12.1   12.7.2.5 16.1
 Ballot Period
   CD/PDAM/PDISP/PDTR 9.4
   DIS 9.8
   DTR 9.4
   FCD/FPDAM/FPDISP 9.4.1
   FDIS/FDAM/FDISP 9.7
   JTC 1 actions 9.1.7
   Minimum 9.1.7 
   NP 9.3
Ballot resolution  9.8  13.1   16.5.1 
Base standard 17.1
Basic standard 3.4.4
Business plan. see JTC1 or SC 
Calling notice. see Meetings 
Cancellation 
   Meeting 7.5 
   Work Items 6.3.1.4 
CD  
   Appeals 11.1
   Ballot 12.2.7
   Changes to text 12.6
   Combined ballot 
     With NP 12.2.7
     With registration 12.2.7
   Comments 12.2.4 12.6.2
   Consensus 12.5.3
   Cover page G6
   Discussion at meeting 7.7.7
   Disposition of comments 12.2.4 12.6.3.6
   Distribution 8.3 12.6.2
   Executive summary 12.5.6
   Explanatory report 12.6.3.9  
   Finalization 12.6.3 
   Letter ballot G8 
   Letter ballot duration 12.6.2.2 
   Number 8.2
   Progress control 6.4  12.6.3.11
   Registration 4.1.4 6.3.1.1 12.5.7
   Substantial support 16.2
   Successive 12.1 12.2.3
    Title 12.5.1.4 12.6.1.4
   Voting   9.3.1.2
   Voting summary 12.6.3.2
 Chairman 
   Acting 5.4.1.2 
   JTC 1 
     Appointment 4.3.1.2
     Neutrality 4.2.2.2
     Responsibility 2.1.1 2.2.4 3.3.3.1.2 3.4.2.1 4.2 4.3.1.1
     Term of office 5.1.1
   Meeting 7.2
   SC 
     Appointment 5.4.1
     Neutrality 5.4.2.1  
     Responsibility 4.4.1.1 4.6 5.5 6.2.1.2  6.4.1.3  7.7.2  
     Term of office 5.4.1
   Vote 9.1.1
Collaborative relationship with ITU T 2.6.4
Combined voting procedure 9.5 12.7.2.1
 Committee draft. see CD
 Committee of Action of the IEC. see TMB/CA
Committee stage 12.1  12.6.1.3
Conciliation panel 9.2 11.3
Confirmation (of standard). see Periodic Review
Conformity (to standards) 10.4.2.2 17.3 C1 G3 Annex I J2.3 
Consensus 1.2 7.7  12.5.3 12.6.3.9 13.8 16.9
Contributions 2.3.1.2 2.6.1.3 3.2 7.6.3 7.8.1
   Deadline for meetings 7.8.1
 Convener
   Non-permanent entity 2.6.1.4  5.6  7.8.2 
   SWG
     Appointment 5.2
     Responsibility  7.8.2 
     Term of office 5.4.1
   WG
     Appointment 5.4.1
     WG Responsibility 2.6.1  4.4.2  5.5  7.1  7.6.3  7.7  7.10  8.3.3  8.3.6  12.5.2  13.5  15.4.5  15.4.9  16.13
     WG Term of Office 5.5
   Convener Workshop 2.7.1
 Coordinating Standard 3.4.1
 Coordination
   National Level 6.2.1.3
   Outside JTC 1 3.3.4.2  3.4.1.2  4.1.1  6.2.1.6
   Resolution of difficulties 3.4.3
   Technical 3.3.2.1  J3.2
   Within JTC1 2.3.1  5.3
 Copyright 10.2  13.2  16.5.2
 Corrected Reprint of Standard 15.4.2.1
 Correction of standard. see Defect correction
 Correspondence, conduct of business by 7.1  7.11.2
 Correspondent members of ISO 3.2
 Councils of ISO and IEC 1.1  1.2  2.7.2.2  3.4.1.1  4.1.2  4.2.2.1  5.1.1  10.1  11.1.1  11.4  A1
 Cover page
   Amendment G21
   CD GG  G6
   Fast Track DIS G17
   FDIS G9
   FDISP G15  G20
   ISP G24
   N-Document G1
   Technical Corrigendum G22
   TR G23
 DAM. see also Amendment
   Fast Track 13.1
   TR 16.4.2
 Database 4.4.2
 DCOR. see Technical Corrigendum
 Defect correction. see also Technical Corrigendum
   Defect report
     Distribution 15.4.4
     Form G5
     Index 15.4.10
     Response Preparation 15.4.7
     Response Processing 15.4.9
     Submission 15.4.5
   Definitions 15.4.1
   Documents 8.2
   Editing Group 15.4.4
   Editor 15.4.7
   Editorial Defect 15.4.9.3
   Procedure 15.4.3
   SC Procedure 15.4.2.3
   Special Procedure 15.4.10
   Technical defect 15.4.9.4
   Voting 15.4.9.4.3
 Delay avoidance 4.2.1.2  5.7.3  6.2.2.1  12.2.2
 DIS
   Appeals 11.1
   Approval criteria 9.5
   Changes to text 13.14  16.16
   Cover page G17
   Discussion during ballot 9.8
   Failure to vote 9.3.1.1
   Fast-track 13.1
   Late votes and comments 13.12  16.8
   Letter ballot G18
   Obligation to vote 3.1
   Voting 9.5  9.8
 Document
   Access Control H7  HD
   Distribution 4.4.2  8.3  H1
   Electronic File Naming H4.4.1
   Electronic Formats H4.1  HE
   Meeting 7.8
   Numbering 8.2
   Register 4.4.2  H4.4.3
   Types 8.1
 Draft Amendment. see DAM or FDAM
 Draft International Standard. see DIS or FDIS
 Draft International Standardized Profile. see FDISP
 Draft Technical Report. see DTR
 Drafting Committee 7.10.2
 DTR. see also TR
   Fast-Track 16.5
   Letter-Ballot G14
   Voting 9.10  16.3.5  16.5.3
 Duplication Avoidance 2.2.5  3.3.3.2.1  6.2.1.3
 Editing Group 2.6.2.6  15.4.4
 Edition of standard 4.6.3  15.1.5  15.3.2  15.4.9.4.5  15.5.1
 Editorial defect. see Defect correction
 Eight-week rule 7.6.3
 Electronic messaging 7.11.2
 Enquiry period 9.4.1  12.6.1.2  12.6.3.2
 Executive Summary 12.5.6
 Explanatory report
   CD 12.6.3.2  12.6.3.9
   FCD 12.6.3.6  12.6.3.9
   Form G11
   PDISP 17.3.1
 Explanatory reports
   FCD 3.4.3.4
 Fast-track. see also DIS
   Approval criteria 13.1
   Ballot Resolution 13.5  16.4.4.1  16.5.3
   Letter ballot duration 13.4  16.6
   Procedure 13.1
   Project editor 13.1  13.5  13.14  16.5.1  16.7  16.11
   Publication 13.9  16.11
   Report 13.11  16.13
   SC assignment 13.1  16.5.1
   Submission 13.1  J3.1
   Suspension of 5-stage process 11.4  13.2  16.5
   TR 16.4.2
   Voting 9.2
 FCD. see also CD
   Advancement to FDIS 12.7
   Ballot 12.5.6
   Combined ballot
     With Registration 12.6.1
   Comments 12.2.3  12.6.2.4
   Consensus 12.5.3
   Cover Page G7
   Disposition of Comments 12.6.2.4
   Distribution 12.6.2
   Executive Summary 12.5.6
   Explanatory report 3.4.3.4  12.6.3.9
   Final Text 12.6.3  12.6.3.9
   Finalization 12.6.3
   Letter Ballot G8
   Letter ballot duration 12.6.3.2
   Substantial Support 12.6.3.5
   Voting 9.4.1
   Voting Summary 12.6.3.2
 FD 6.2.1.7  10.4
 FDAM. see also Amendment
   Approval Criteria 9.4.1
   Cover Page G12
   Letter Ballot G13
   Voting 9.7
 FDIS
   Approval Criteria 9.6
   Cover Page G9
   Distribution 12.7.1
   Failure to Vote 9.1.8
   Final Text 12.6.3.9
   Lack of Approval 12.7.2.5
   Letter Ballot G10
   Letter Ballot Duration 12.7
   Obligation to Vote 3.1
   Registration 12.6.3.9
   Voting 9.5  9.7  12.7.2
    Voting Results 12.7.2.2
 FDISP. see also ISP
   Approval Criteria 9.4.1
   Cover Page G15
   Letter Ballot G16
   Voting 9.7
 FDT 6.2.1.7  10.4.1
 Fees. see Meetings
 Five-year review. see Periodic review
 Formal description. see FD
 Formal description technique. see FDT
 FPDAM. see also Amendment
   Ballot 12.6.1.2
   Voting 9.4.1
 FPDISP
   Voting 9.4.1
 Framework. see ISP
 Functional standard. see ISP
 Head of Delegation 7.7.5  9.1.1
 Health considerations 10.1
 IEC national committees
   Comments 12.6.3.6
   Voting 9.5
 Information Technology
   Definition 12.1
 International Standard. see IS
 International Standardized Profile. see ISP
 Interoperability G3  I
 IS
   Confirmation 15.3
   Cover page G20
   Documents 8.1.1
   Periodic Review 15.3.1
   Previous Editions 15.3.1
   Proof Text 13.14  16.16
   Revision 15.1
   Withdraw 15.2
   Publication 15.3.1
     Minor Revision 15.1.2
   Withdraw 15.2
 IS0 1000 10.6
 IS0 2375 18.2
 IS0 31 10.6
 IS0 3166 18.3
 IS0 6523 18.2
 IS0 Member Bodies Comments 12.6.3.6
 IS0 Voting 9.5
 ISO/IEC 10021 18.3.1
 ISO/IEC 13210 J2.3
 ISO/IEC 8348 18.3.1
 ISO/IEC 9646 J2.3
 ISO/IEC Directives
   Directives Part 1 1.1  2.7.3  6.1.1  10.3
   Directives Part 2 1.1  2.6.2.6  10.3  10.6  12.5.5  13.14  15.5.4  16.16  A1
 ISO/IEC TR 10000 17.1  17.2.4
 ISP
   Cover Page G24
   Definition 17.1
   Document 8.1.3
   Framework 17.2.2  17.2.2
   Procedures 16.10
 ITTF
   Comments 12.6.2.1
   Confirmation of standard 16.1
   Coordination 4.1.1  4.1.4
   Copyright 10.2
   Document Register 12.5.1.1
   Document Storage 15
   FCD 12.5.3
   FDIS 12.6.3.9  12.6.3.9
   Final Text 8.3.1  13.5  16.7
   Liaison 3.3
   Meeting schedules 7.2
   Programme of work 6
   Progress control 6.4
   Publication 2.7.2.4  12.1  13.9  14.4.3.10  14.4.3.10  15.1.2  15.4.7  15.4.9  16.2.1
   Records 4.1.4  4.6
   Registration Authorities 2.7.2  2.7.2.3  18
   Votes 9.3.2
   ITU T 1.1  2.3.1.1  2.6.4  3.3.4.3  15.4.4  15.4.9
 Joint Technical Programming Committee. see JTPC
 Joint working group. see JWG
 JTC 1
   Administration 4.2
   Business plan 2.5.2.3  6.1.1  G25
   Chairman. see Chairman
   Document distribution 8.3
   Establishment 2
   Membership 2.3.1.2  2.3.2  3
   Officers 5
   Plenary meetings 2.3.1.1  2.3.1.2
   Primary duty 2.2.2
   Procedure documents 1.1
   Organisations 2.3
   Scope 1.1
   Secretariat. see Secretariat
   Title 2.1
   JTPC 2.1.1
   JWG 2.6.3
   Letter ballot 9.1
     CD/FCD G8
     DCOR G9
     DIS G18  G14
     FDAM G12
     FDIS G9
     FDISP G15
     N-document G2
     NP G4
 Liaison
   API review J1
   API Category A 2.7.2.1  3.3.4.1  6.2.1.1  8.3.4  13.1
   API Category B 3.3.4.2
   API Category C 3.3.4.2  9.3.1.1
   Comments 9.3.1.1  9.4.1  9.8  12.6.2.1
   Coordinator 3.3.4.4
   Document distribution  8.3.6  12.6.3.2
   Establishment 3.3.1.1  4.1.4
   External 3.3.4
   Formal 3.3.2.2
   Internal
     Internal with other ISO and IEC TCs 3.3.2.2  3.3.3
   Membership
     Internal within JTC1 3.3.3.1
     Membership at JTC 1 level 2.5.3.1
     Membership at SC level 2.5.4
     Membership at WG level 2.6.1
     Membership Vote 2.3.1.2
   Reciprocal 3.3.1.2
   Representatives 3.3.3.1.3
   Technical 3.3.3.2
   With ITU T 3.3.4.3
 Maintenance
   IS 14.4.3.14
   register E2.2
   TR 16.1
 Maintenance agency 15.1.4  G3
 Media, storage of 15
 Meetings 7.1
   Ad hoc  7.10.2  7.10.4  7.11.1
   Agenda. see Agenda
   Attendance 7.7  6.2.1.4
   Ballot resolution. see Ballot resolution
   Calendar 7.3
   Calling notice 7.5
   Cancellation 7.5
   Contributions. see Contributions
   Costs 7.4.1
   Electronic 7.8.1
   Fees 7.4.1.2
   Host 7.3
   JTC 1 plenary 7.8  2.3.2.1
   Languages 7.9
   List of delegates 7.10.4  7.6
   Location 7.6.4
   Minutes 4.6.2
   Reports. see Reports
   Resolutions. see Resolutions
   Secretarial services 6.4.2
   WG 2.6.1.2  4.4.2
 Membership. see also JTC 1, SC, SGFS, SWG, WG
   Application 2.3.1.2
   Categories 2.3.1.2  3.1
   Change in category 2.3.1.2    Liaison. see Liaison
   O-member 3.2  7.7.5
     O-member Confirmation 3.2
   P-member 3.1  12.6.3.9
     P-member change to O-member 3.2  9.1.8
     P-member inactivity 9.1.8  3.1.1
     P-member Obligations 3.1.1  3.4.1  7.7  8.3  11.1
 Minor enhancements of work 6.2.2.1
 Minutes 4.6.1
 Model 6.2.1.8  16.2.3  G3  J1
 Mutual recognition C3
 Naming domain 18.2  E1
 National Body. see NB
   Change of Status 3.1.3  9.1.8
   Responsibilities 2.5.3  2.6.1  3.1  4.2  5.4.1.1  5.6  6.2.1.3  7.3  7.4.2  7.5  8.3.2  9.1  12.2  13.5  16.9  A1
 Natural Language 10.4.2.1
 Negative votes. see Voting
 New work area
   Applicability 6.2.3.1
   NP processing 6.2.3.3
   Study period 12.6.1.2
 New work item proposal. see NP
 NP. see also New work area
   Acceptance Criteria 6.2.1.2  G3
   Appeals 11.3
   Approval 6.2.1.3  9.6
   Change in Scope 12.5.1.3
   Combined ballot 12.5.8
   Form G3
   Justification 6.2.1.2
   Letter ballot G4
   Progress control 12.6.3.6
   Submitting 6.2.1.5  13.9  G3
   Voting 9.1
 NP
   Submitting J3.1
 Numbering
   CD 12.6.1.3
   Defects 15.4.3
   Document 8.2.3
   IS 12.5.1.2
   Project 6.1.2  12.5.1.1
   Resolutions 7.10.4
   SC 2.5.1.1
   WD 12.5.1.2
 O member. see Membership
 Other working group. see OWG
 OWG
   Administration 2.6
   Convener. see Convener:Non-permanent entity
   Establishment 2.6.2.1
   Examples 2.6.2.5
   Participation 2.6.2.2
   Terms of reference 2.6.2.3
 Patents 10.3  G3
 PDAM. see also Amendment
   Ballot 9.4 12.6.3.2
   TR 16.4.2
   Voting 9.4
 PDISP. see also ISP
   Explanatory Report 17.4
   Submission 17.3.2
   Voting 9.4
 PDTR. see also TR
   Progression 16.3.1
   Voting 9.4
 Periodic review 15.3
 P member. see Membership
 Preliminary stage 12.1
 Preparatory stage 12.1  12.5
 Priorities 2.3.1.1  6.2.1.5  6.2.1.6  6.2.3.3.2  7.6.4
 Programme of work 2.2.5  6.1  6.3.1.2  15.5  16.4.3.1
   Additions 6.2
   Enhancements 6.2.2.1
   SC 2.5.2.1  2.6.1.4  6.4.2.2  15.1  16.4.3.1
 Progress control 2.6.1.4  6.4.1  12.5.8  12.6.3.11
 Project. see Work item
 Proposal Stage 6.2.1  12.1  12.6.2.1
 Proxy vote. see Voting
 Publication Stage 12.1  12.8
 Rapid amendment. see Defect correction
 Rapporteur 5.3  6.2.3.2.4
   CAI AnnexI
   Group 2.3.2.1  2.6.2.5  4.2.4  7.11.1  15.4.4
 Records keeping 4.1.4  4.2.2.3  4.6
 Reference materials required for end products 3.4.4.2
 Register
   Copyright 10.2
   Document. see Document register
   Objects 2.7.2.4  18.1  E1  E2.2  E2.13.1
 Registration authority 2.7.2  6.2.1.9  10.2  17.4  E1  E2.2  E2.8.1  E2.10  E2.13.2  G3
 Registration procedure standard  4.1  18.1  E1  E2.4  E2.12
 Reports
   Accounting 7.4.2.3.10
   Annual 2.7.2.4  6.4.2.1
   Defect. see Defect correction
   Disposition of comments 12.2.4  12.6.3.6  16.6
   Explanatory 3.4.3.4  12.6.3.6  17.4  G11
   Liaison 3.3.2.1
   Meeting  4.4.2  7.10  7.11
   Progress 4.4.2
   SC 6.4.2
 Resolutions 4.4.2  4.6.2  7.5.2  7.6.4  7.10
 Review (of standard). see Periodic review
 Revision (of standard). see IS:Revision
 RG-CAI AnnexI
 Safety considerations 10.1
 SC
   Administration 4.3
   Business plan 2.3.1.1  2.5.2.3  6.4.1.4  6.4.2.2  7.6.4  G25
   Chairman. see Chairman
   Dissolution 2.5.1
   Document distribution 8.3  H4
   Establishment 2.5.1
   Membership 2.5.3
   Numbering 2.5.1
   Plenary. see Meetings
   Responsibility for
     Responsibility for API specification J3.1.1
     Responsibility for Conformity requirements C1  AnnexI
     Responsibility for Interoperability AnnexI
   Scope 2.5.2
   Secretariat. see Secretariat
   Size 2.5.1.3
   Title 2.5.2
 Scope
   Change in Project 12.5.1.3
   Directives 1.1
   JTC 1 2.1.2
   New work item 6.2.1.6
   SC 2.5.2.1
 Secretariat
   JTC 1
     Allocation 4.2.1
     Neutrality 4.2.2.2
     Relinquishment 4.2.1.3
     Responsibility   2.3.1.1  2.6.2.6  3.1.2  3.4.1.2  4.2.2  4.6.1  16.5.2
   Resources A1
   SC
     Allocation 4.3.1
     Neutrality 4.3.2.2
     Relinquishment 4.3.1.3
     Responsibility 2.5.2  2.6.1.2  2.6.2.6  3.1.2  3.3.3.1.2  3.4.2.1  4.3.2  4.4.1.1  4.6  5.5  6.4.2.2  8.3.1  12.2.7  12.5.7  13.4  15.1.1  16.3.4  16.4.3.1  16.7
   SWG
     Allocation 4.2.3
     Responsibility 4.2.3  4.3.2.1  4.3.2.2
   WG
     Allocation 4.4.1
     Responsibility 4.4.1.1  15.4.5
   Workshop
     Responsibility 2.7.1
 Secretaries-General 1.1  3.1.3  3.3.4.1.2  3.4.3.2  4.1.3  4.2.1.4  6.2.1.1  6.2.1.1  7.3.4  7.7.3  9.1.8  10.1  11.2.2  11.3.2  15.3.1
 Secretary
   Qualifications A2  5.5
   WG 5.5
 SI Units 10.6
 Special working group. see SWG
 Stages of technical work 12.1  16.1  AnnexB
 Study period 6.2.1.3  6.2.3.2.1  12.3
 Subcommittee. see SC
 Subsidiary body 2.2.1  3.3.4.2
 Substantial support 9.4.3  9.11.2  12.6.3.5  16.2.1
 SWG
   Convener. see Convener
   Membership 2.3.2
   Secretariat. see Secretariat
 Target dates 2.3.1.1  2.6.1.4  6.2.1.5  6.2.1.5  6.2.1.6  6.3  6.3.1.3  7.6.4
 Taxonomy of profiles 17.2
 Technical addition 15.4.1  15.5.2
 Technical change 15.4.1  15.5.2
 Technical Corrigendum. see also Defect correction
   Cover page G22
   Disposition of comments 15.4.9.4.5
   Incorporating into IS 5.7.3
   Letter ballot G9
   Listing status 15.4.9.4.1
   Periodic Review 15.3
   Previous Editions 15.1.5
   Publication 15.4.2.1
   Purpose 15.4.2  15.4.9
   Voting 9.10.2  15.4.9.4.3
 Technical defect. see Defect correction
 Technical Management Board of ISO. see TMB/CA
 Teleconferencing 7.11.1
 Terms of reference
   Collaborative Interchange 2.6.4
   OWG 2.6.2
   WG 2.6
 TMB/CA 2.1.2  3.4.2.2  4.2.1.1  6.2.1.1  6.3.1.5  10.6  11.3.3  A2
 TR
   Amendment 16.4.4
   Cover Page G23
   Fast Track 16.5
   Maintenance 16.4
   Procedures 16.3
   Publication 16.3.6
   Purpose 16.1
   Review 16.3.5
   Revision 16.4.3
   Type 1 16.2.1 16.2.4
   Type 2 16.2.2 16.2.4
   Type 3 16.2.3
   Withdrawal 16.4.5
 Trademark 13.2  16.5.2
 Translation 7.9.1  A1
 User Requirements  10.5
 Voting. see also documents voted on
   at Meetings 7.7.4  9.1
   Combined Procedure 9.5
   Criteria 9.1 9.6
   Failure 9.1.8
   Late 9.1.7  9.6
   Liason Member 3.3.1.2
   Negative 9.1.6
   O member 3.2
   P-member 3.1.1
   Proxy 3.1.3  7.7.7  9.1.1
   Records 4.6
 WD 6.2.1.2  12.5
   Criteria for Progression 12.5.7
 WG
   Administration 4.4
   Contributions 2.6.1.3
   Convener. see Convener
   Document Distribution  6.2.1.3 8.3
   Establishment 2.6
   JWG 2.6.3
   Membership 2.6.1.2
   NB positions 2.6.1.3
   Other. see OWG
   Secretariat. see Secretariat
   Special. see SWG
   WG Terms of Reference 2.6.1.1
 Withdrawal (of standard). see IS:Withdrawal
 Work item. see also NP, Programme of work
   Assignment 12.5.1  13.1  16.6
   Deletion 6.2.3.3.3  6.4.1.3
   Number 6.1.2  12.5.1.1
   Registration at ITTF 12.5.1.2
   Subdivision 6.2.2  15.5  16.4.4.1
   Time limits for Progression 6.4
 Working draft. see WD
 Working group. see WG
 Workshop
   Administration  2.7 4.5
   Establishment 2.7 4.5
   Participation 2.7.1
   Secretariat. see Secretariat
 World wide web
   Document Distribution Policy H1
   Page Structure I
   Pages H4.3
   Server II


Foreword   Table of Contents   List of Abbreviations   Index
Chapter: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Annex: A B C D E F G H HA HB HD HE  HF HG I J K  L  LA LB M MA  N O